Assess how much of the existing asset can be retained

MOBILITY
AGV2AMR Retrofit
Staged modernization of legacy AGVs — Evaluates the existing vehicle and safety architecture before adding localization, mission and fleet capabilities in controlled phases.
P0 · concept validationReduce operational disruption through phased migration
Expand functions without obscuring safety and control responsibility
COMPONENTS
Components
- Vehicle and safety interface
- Localization and navigation kit
- Gateway adapter
- Fleet connector
INTEGRATION
Integration
- Safety PLC
- Encoders and sensors
- FleetOS
- Factory network
DELIVERABLES
Deliverables
- Vehicle and safety diagnosis
- Retrofit BOM
- Interface map
- Driving and stopping validation report
VALIDATION ITEMS
What must be validated before specifications
Performance, specifications and schedule are confirmed only after validating the actual samples and site conditions.
- 01Vehicle condition
- 02Braking and safety circuit
- 03Payload conditions
- 04Floor and wireless environment
- 05Certification scope
RELATED
Related solutions
Orchestrate heterogeneous fleets, traffic, charging, WMS/MES interfaces and site safety.
FleetOS
Multi-vendor fleet orchestration and traffic management
Coordinates heterogeneous mobile robots, traffic, charging and plant missions while preserving safety interfaces and operational ownership.
Learn more
OmniMove 600
Concept for a standardized 600 kg-class AMR platform
A configurable mobile platform concept with selectable top modules and safety architecture. Final specifications are confirmed only after project validation.
Learn moreAGV2AMR Retrofit
Validate feasibility with actual samples and site conditions
Product status and specifications are stated in the proposal based on validation and supply conditions.